Blog · Orangeville
Basement apartment drywall in Orangeville: what the Town's 2025 rules and the fire separation mean
Orangeville now allows up to three units on a fully serviced lot, and a basement apartment is the most common way owners use that. The drywall in that apartment is not a finish. It is the fire separation the building inspector checks.
Last updated November 22, 2026 · Reviewed by the Orangeville Drywalling team
What the Town allows
The Town of Orangeville's 2025 Guide to Additional Residential Units allows up to three units on a fully serviced lot: the main house plus up to two additional units inside it, or one inside and one in a detached building. Additional units are allowed with a single detached, semi-detached, linked house or townhouse. Each additional unit can have at most two bedrooms, needs an unobstructed path at least 1.2 metres wide from the street or lane to its entrance, and needs its own parking space of at least 2.6 by 5.5 metres. All units connect to municipal water and sewer through the main house, a building permit is required, and the unit has to meet the Building Code, the Fire Code and conservation authority rules.
Check zoning and parking with the Town's Planning Division (planning@orangeville.ca, 519-941-0440 ext. 2228) before paying for drawings. Building permit applications go to the Building Division at building@orangeville.ca or Town Hall, 87 Broadway.
What the drywall has to do
Ontario's guide to adding a second unit sets the fire separation between units at 30 minutes, reducible to 15 minutes where the smoke alarms in both units are interconnected. The approved drawings specify the board type and number of layers on the ceiling and the shared walls. Our job is to build exactly that, and to keep it continuous.
The details that fail inspections
- Gaps at bulkheads and soffits. The separation has to run over the top of ducts and beams, not stop at the bulkhead.
- Penetrations. The range hood run, bath fans, plastic pot light housings and ducts that pass through the ceiling are boxed in to the rating on the drawings.
- The furnace room and stairs. Shared spaces are where most separations have holes, so they are drawn and built deliberately.
- Headroom. The provincial guide requires a ceiling height of 1.95 metres over the required floor area, so bulkheads are planned before boarding, not discovered after.
Outside the Town
In Mono, Amaranth, Grand Valley, Shelburne and the other Dufferin townships, permits come from Dufferin County Building Services, which publishes a separate basement apartment checklist for homes on a septic system. In Shelburne, the County has posted a temporary pause on permits for new accessory units that need wastewater capacity, so talk to the Town of Shelburne first.
What it adds to the cost
A fire-rated ceiling commonly adds $1.00–$2.50 per square foot over an ordinary basement ceiling, more where there is a lot of boxing. The full planning ranges are on the Orangeville drywall cost guide.
Sources
- Guide to Additional Residential Units (2025) - Town of Orangeville
- Add a second unit in your house - Government of Ontario
- Building Services - Dufferin County
- Building permit requirements and information - Town of Orangeville
Request a Quote
Call 226-241-9255 or send the form and we will get back to you within one business day.
📷 Text us a photo, get a price
Snap the hole, crack or ceiling and text it to 226-241-9255. We'll get back to you with a price.